Ray Murray, Inc.

Catalog

Poly Coated Copper Tubing

  • Easy to identify
    • Permanent yellow polyethylene coating
    • Continuous line marking
    • Traceable back to origin of manufacturing
    • Mill test reports available upon request
  • Easy to install
    • No additional training required for installation
    • Flexible
    • Easy to join
    • Compact size
    • Requires smaller and fewer tools than steel pipe
    • Cleaner than threaded steel pipe
  • Cost Efficient
    • Most economical line-marked tubing on the market
    • Minimal labor costs due to quick and easy installation
    • No on-site sleeving required for underground gas lines
  • Recyclable
    • Copper is fully recyclable